Allithwaite Upper: change of use from B1 (Business) to B2 for MOT and Repair Garage, at 23 Alnat Business Park, Lindale, Grange-over-Sands, for D. Marwood, DJ Marwood Ltd.

Above Derwent: Construction of a timber summer house, 3.6m x 2.4m in the garden - resubmission of 7/2014/2284, at Retreat, Thornthwaite, Keswick, for Prof. Davies.

Bampton: Use as a private dwelling house, at Beckfoot House, Helton, Penrith, for Mr. White; agricultural building for housing sheep, at Littlewater Farm, for A. Metcalfe.

Bassenthwaite: Use of building as either live/work unit or local occupancy dwelling-house, at The Rake, for M. Tully.

Blindcrake: Fell 1 pine tree, prune 1 cedar-type tree (thuja), 1 larch tree, 1 ash tree and birch trees, at Shell Cottage, Blindcrake, Cockermouth, for F. McConkey.

Caldbeck: Notification for Prior Approval for a Proposed Change of Use of shop to dwelling, at Old Map Shop, Caldbeck, Wigton, for C. Jordon.

Colton: Small conservatory on NW corner of property, at Side House, Bandrake Head, Ulverston, for Dr. Bartlett

Crosthwaite and Lyth: EcoPod pre-school modular building at the rear of the existing school. It will be sited in place of a relocated timber framed free standing play shelter, at Crosthwaite C of E School, Kendal, for M. Jessop, Board of Governors.

Duddon: Variation of condition no. 2 on planning approval ref 7/2013/5448 to allow for change in roof material and proportion of stone cladding and Yorkshire boarding to be varied, at Troutal, Seathwaite, Broughton-in-Furness, for T. Slater, National Trust; non-material amendment to planning approval ref 7/2013/5489 relating to inclusion of velux on south elevation, at The Old Smithy, Occupation Lane, Broughton-in-Furness, for M. McGinty; fell 4 silver birch, at 6 Broom Close, Broughton-in-Furness, for B. Barclay.

Embleton and District: Retrospective - alterations to agricultural building and creation of track, at field north of Embleton Spa Hotel, for R. Blackburn.

Gosforth: Change of use of former Wheatsheaf Public House/Owners Accommodation to 3 no. dwellings with associated external alterations, at The Wheatsheaf, The Square, Seascale, for P. Mossop, Jackson’s Timber Ltd

Haverthwaite Staveley in Cartmel: Demolition of existing extension and construction of new two storey extension to east elevation, at Glendalough, Hazelrigg Lane, Newby Bridge, Ulverston, for P.Cox.

Lakes: First floor side extension of the existing/approved dwelling, at 5 Calgarth Cottages, Troutbeck Bridge, Windermere, at Gleadhill House Studd Ltd; change of use from ancillary accommodation to North Syke to a separate self-contained unit for local occupancy; construction of timber fence, at North Syke, North Road, Ambleside, for Ms Fagg; temporary permission for a 400mm pipeline running from Great Langdale Beck to Elterwater’s inner basin to improve water quality in the lake, at Great Langdale Beck to Elterwater, for I. McMurdo, South Cumbria Rivers Trust; modification of existing foul and storm drainage system with new septic plant, at Town Head Farm, Grasmere, Ambleside, for Ms Ball.

Keswick: Proposed new roof lantern over dining room, at The Millfield Retirement Home, Penrith Road, for Cumbria Nursing Services (Millfield) Ltd; construction of single dwelling, at vacant plot between Manesty and Pinecones, Springs Garth, for Mr & Mrs Foulkes; replacement of external self service machine, at HSBC, Market Square, for HSBC Group plc; construction of a new pumping station consisting of 2 pumps in a below ground pumping chamber, associated pipework and a new above ground control kiosk, at Car Park, Elliott Park, for D. Coyle, Cumbria County Council; new window at first floor level in western elevation, at Melyn Howe, Southey Hill, for Mr & Mrs Howell.

Muncaster: 1 x coastal interpretation board plus 1 x marine litter information board, at Eskside, Ravenglass, for Ms Ward, Copeland Borough Council.  

Skelwith, Lakes: Woodland needs thinning out, approx. 15-16cm, 1.5m above ground level, all windblown trees and dead wood need clearing, all hazel, alder and willow etc. need coppicing as well as pruning of trees along the driveway, at The Wyke, Pull Woods, Ambleside, for Mr Lancaster.

Staveley in Cartmel: Construction of a replacement dwelling, at Westward, Ayside, Grange-over-Sands, for Mr & Mrs Routledge.

Underbarrow and Bradleyfield: Proposed amended rear extension to approved extension 7/2014/5505, at 5 Hillgarth, Kendal, for A. Metcalfe; new post office, new restaurant, new guest accommodation, at Punch Bowl Inn, Kendal, for C. Holt, Punch Bowl Inn.

Windermere: Fell 1 holly and crown raise 1 fir tree, at AJ Morgan & Associates, St. John’s Surgery, Lake Road, for A. Morgan; change of use from one A1 shop to 3 number A1 shops, at Triarom House, Birch Street, for D. Shaw; fell 1 sycamore tree, at Belle Isle View, Bowness-on Windermere, for Mrs Middleton; change of use of redundant stone buildings to staff accommodation (2 x 1 bed flats) and two self catering apartments with associated minor operational development, at Limefitt Caravan Park, Patterdale Road, for A. Hodgson, Lake District Leisure Pursuits; alterations and extension, at Thorndale House and Thorndale Flat, 2 Queens Drive, for Mr & Mrs Babbs.

Witherslack, Meathop and Ulpha, Crosthwaite and Lyth: Amend existing access into Foulshaw Moss from the A590. Works include realignment of the junction bell-mouth to make it easier for vehicles to access/egress the site with greater safety; widen existing private access track onto site from approximately 4.5m to 6m, at Foulshaw Moss Nature Reserve, nr Witherslack, for J. Murphy, Cumbria Wildlife Trust.